skip navigation links JCCC Home
Future Students Current Students Faculty & Staff Continuing Education Friends & Visitors Tracks
Image of sky, and shadowed tree limbs and leaves with two heads in silhouette and the text Learning Comes First at JCCC.
ATB Shelter Instructions
Divider

ATB Floor Plan

ATB Floor Plan

ATB SHELTER INSTRUCTIONS

  • ATB 101, 109, 111, 115(ART AREAS) GO TO NORTH-SOUTH HALLWAY ADJACENT TO ATB 131, ATB 133, ATB 135
  • ATB 127 AND 128 GO TO ATB 164A
  • ATB 131 AND 133 GO TO ATB 182
  • ATB 132 GO TO ATB 129
  • ATB 134 GO TO ATB 125
  • ATB 145 (PHOTO AREAS) GO TO ATB 147
  • ATB 123, 125, 129, 135, 142, 147, 155, 164A STAY PUT
  • METAL FAB PROGRAM SHOPS GO TO ATB 142
  • HVAC PROGRAM SHOPS GO TO ATB 155 OR ATB 164A
  • AUTO TECHNOLOGY PROGRAM SHOPS GO TO ATB 182
  • STAFF IN INTERNAL OFFICES WITHOUT WINDOWS STAY PUT